|
1. Where is Xiamen? Click to see where Xiamen is.
2. What's the payment terms? We accept L/C, T/T, D/P, D/A. Any payment methods popular in international transactions. On our first transaction with new customers, we usually require for L/C at sight.
3. How long it will take from placing the order to deliver on board? The whole production includes 3 steps. The first step is material preparation. To make all the materials (including the fabrics, plastic buckles, zippers) ready usually takes 2 weeks. The second step is stitching on sewing machines. This step closely followed by inspection and packing, which is the third step, either to return the inferior bags back to sewing machine or clean and package the qualified bags into polybag. The second step and the third step usually takes another two weeks. So the overall lead time is around one month to 45 days, depends on the quantity.
4. Is it possible to put on your own logos? The answer is YES. We are very happy to become your OEM partner.
5. Is it possible to send your own ideas/designs and let factory actualize the bags? The answer is YES. Our talented designers will be happy to serve.
|